Floor
to the warehouse
and must be
properly installed
hard recess
on the ground -
should not overhang,
the damage to the stone
floor storage, metal,
should be cleared from the
cutting and drilling
materials.
If a platform
created under the
tank will be installed
in the floor
of the platform should be
smooth, hard surface.
Stepless platform surface
must be flat surface.
The installation of the tank
must be carried out by people.
Should be left around the
warehouse space for
installation and subsequent
to service operations.
Transport and installation
must be performed while the
empty storage
tank.
Store input and output
couplers should not be
tightened too much
(torn gasket,
water may leak),
or output
should be left loose.
(Output may be
water leakage from the
seal to
not get bored)
Any action is to be
performed near the
warehouse (source,
such as grinding)
to avoid damage to the
storage tank
should be strictly
isolated.
Warehouse soil
should be prepared in advance
and six wells
will be installed and
20 cm -
should be covered with 25
cm thick concrete.
Land between
the walls with
six storage
tanks surface
must be left up to
10 cm.
Carefully place
to be buried
tank must be
placed after the
settlement final checks
must be carried out.
After the installation
of underground
storage tanks
must be careful not to
exceed the load
out.
|
|
|
|